Regional Connector Project

Regional Connector Project

This project consists of a highly anticipated light-rail corridor shooting through downtown Los Angeles, bringing increased mobility and a more flexible transportation path to the city. It includes several new stations serving numerous residential and commercial communities. KES has a full time environmental manager acting as an integral member of the project build team. KES is responsible for continuous noise and vibration monitoring and planning, performing soil sampling, contaminated soil removal, preparing project plans and procedures, and devising a contaminated soil and groundwater treatment plan. In additional, KES provided stormwater plans, a wet weather erosion and sediment control plan, and a wastewater management plan.

YouTube: Los Angeles Regional Connector Project